BETTER TOUCH BETTER BUSINESS
Contact Sales at TRANO.
TRCFA3-33S-T-H-1-2M-L | BEER KEG WASHING AND FILLING MACHINE | |||||||||
![]() | Matching Parameter | Three pumps. three tank without insulating layer | ||||||||
Tank Parameter | Three tank,single tank 100L without insulating layer | |||||||||
Heater Way | Steam heater in two tanks( caustic and hot water) | Capacity | 40-50pcs/H(washer) 40-50pcs/H(Filler) | |||||||
Tank Insulating Layer | No | The table can rise or not | YES | |||||||
Spear Type | A,S,D,M OR G ONE OF THEM | Filling Part With Flowmeter Or Not | YES | |||||||
Power | 380V 3phase 50Hz 3.0KW | According To Customers Power Standard | ||||||||
Size(L*W*H) | 2.25*2.20*2.10M
package: 1.75*2.25*2.29M | Package | Composite Borad Box | |||||||
Equipment explaination | 1. It is use the Siemens S7-200 controller and Schneider buttons and knobs. 2. Separate pipe systems of keg washing part and filling part.The cleaning process adds unique hot caustic washing and steam sterilization function. In addition,add acid washing function. 3. Fill way is invert.The machine will stop until full. 4. You can clean all pipe with CIP system on filling part. 5. The whole machine use the stainless steel AISI304. Pipeline welding uses German automatic pipe welding equipment, one-time welding double-sided forming. Washing working procedure: Pressing→air blowing/drain off→water washing→air blowing/drain off→hot caustic washing→air blowing/to caustic box→hot water1 washing→air blowing/drain off→hot water2 washing→steam blowing/drain off →co2 blowing/drain off→co2 pressure preparing→cylinder return Filling working procedure: Pressing→steam sterilize keg spear→CO2/drain off →open the spear→co2 pressure preparing→filling→close the spear→hot water washing spear surface→steam/drain off→cylinder return | |||||||||
Copyright © 2025 Yantai Trano Co.,Ltd. | All Rights Reserved