loading


Beer Bottle Filler and Capper 1
Beer Bottle Filler and Capper 2
Beer Bottle Filler and Capper 3
Beer Bottle Filler and Capper 1
Beer Bottle Filler and Capper 2
Beer Bottle Filler and Capper 3

Beer Bottle Filler and Capper

5.0
Place of Origin:
Shandong, China
Guarantee:
1 Year
Min.Order:
One set
Payment Terms:
T/T, L/C, Cash, Western Union
Delivery time:
40 working days
Packaging Details:
Plywood case with iron pallet
Supply Ability:
500 Sets per Month
Port:
Qingdao
Applicable Industries:
Food & Beverage Factory, Food Shop, Food & Beverage Shops
Automatic Grade:
Automatic, Semi-automatic
Voltage:
Customized
design customization

    oops...!

    no product data.

    Go to homepage
    PICTURETYPEABF4-4ABF6-6ABF8-8

    Beer Bottle Filler and Capper 4


    Beer Bottle Filler and Capper 5


    Beer Bottle Filler and Capper 6

    Beer Working pressure0.1-0.15Mpa0.1-0.15Mpa0.1-0.15Mpa
    Bottle Type330ml 500ml330ml 500ml330ml 500ml
    Filling part With Flow meter or notNoNoNo
    Air Regulator0.55-0.65Mpa0.55-0.65Mpa0.55-0.65Mpa
    CO2 Regulator0.15-0.2Mpa0.15-0.2Mpa0.15-0.2Mpa
    Beer Source Pressure0.15<X<0.20Mpa0.15<X<0.20Mpa0.15<X<0.20Mpa
    Filling Capacity90-120pcs200-240pcs280-320pcs
    Power1PH 110-240V   50/60/Hz1PH 110-240V   50/60/Hz1PH 110-240V   50/60/Hz
    Size L*W*H(m)1.26x0.7x2.22.0x0.7x2.22.5x0.7x2.2

    MAIN FUNCTION AND FEATURE

    Automatic control by PLC, all parameters can be adjusted.

    Filling and capping process can be finished in this machine at one time.

    With CO2 pressurization and could add vacucum.

    Adopt isobar filling method and with unique pressure maintaining system,performance stable and reliable, beer loss minimum.

    With pressure compensator, to guarantee a stable filling process.

    Could product the glass bottle or Stainless Steel bottle manual filling and capping AIO machine (user-selectable) .

    Beer Bottle Filler and Capper 7
    Beer Bottle Filler and Capper 8
    Beer Bottle Filler and Capper 9
    Beer Bottle Filler and Capper 10
    Beer Bottle Filler and Capper 11

    WORKING PROCESS

    Fix the bottles--CO2 purge---- isobaric——filling-- pressure stabilization--pressure relief--stop--move the bottles to the capping stations--capping--take the bottle.

    Vacucum: Fix the bottles--purging----vacuumizing——isobaric —filling-- pressure stabilization--pressure relief--stop--move the bottles to the capping stations--capping--take the bottle

    GET IN TOUCH WITH Us
    just leave your email or phone number in the contact form so we can send you a free quote for our wide range of designs
    Related Products
    no data

    Contact Sales at TRANO.

    Professional aluminum can manufacturer

    Contact us

    Contact Person: Mrs.Wang
    E-mail: director@aluminum-can.com  
    Tel: 0086 13054501345
    Whats App: 0086 13054501345
    We Chat: 13054501345
    Address: No. 149 Nandajie Road,Zhifu Area Shandong China

    Copyright © 2026 TRANO | Sitemap Privacy Policy
    Customer service
    detect