BETTER TOUCH BETTER BUSINESS
Contact Sales at TRANO.
TRCA2-32E-T-H-1 | Beer Keg Two Heads Washer | |||||||||
Matching Parameter | Two pumps、three tanks without insulating layer is default choice | |||||||||
Tank Parameter | Three tanks,single tank 100L without insulating layer, one is caustic tank, one is rinse water tank, another one is hot water tank. | |||||||||
Heater Way | Electrical heater in caustic and hot watertanks | The table can rise or not | No | |||||||
Tank Insulating Layer | No | Add insulating layer | ||||||||
Spear Type | S/D/A/G type (Choose one of them) | Wheels or feet | Feet | |||||||
Power | 380V 3phase 50 15KW | According To Customers Power Standard | ||||||||
L*W*H | 1.25*1.58*2.03M package: 1.30*1.65*2.25M | Package | Composite Borad Box | |||||||
Equipment explaination | 1、It is use the Siemens LOGO controller and Schneider ,Taiwan AirTAC solenoid valve,pump is Chinese Yuehua. 2、 The cleaning process adds unique hot caustic washing and steam sterilization function. 3、The whole machine use the stainless steel AISI304. Pipeline welding uses German automatic pipe welding equipment, one-time welding double-sided forming. Washing working procedure: Pressing → air blowing/drain off → rinse water washing → air blowing/drain off → hot caustic washing → air blowing/to caustic box → rinse water washing→ air blowing/drain off → hot water 1 washing → air blowing/drain off → hot water 2 washing → air blowing/ drain off → steam sterilized → steam keep pressure sterilized → CO2 blowing/drain off →CO2 pressure preparing | |||||||||
WASHING WORKING PROCESS
Impact-air blowing/drain off-water washing-air blowing/adrain off - hot caustic washing spear- hot caustic washing-air blowing to caustic tank-hot water washing spear-hot water washing- airblowing /drain off-acid washing spear-acid washing-air blowing to acid tank- hot water washing spear- hotwater washing-airblowing/drain off-steam sterilized-steam retaining-CO2 blowing/drain off-pure water (To make the keg cool)-CO2 blowing/to hot water tank-CO2 pressure preparing -cylinder return.
Copyright © 2021 Yantai Trano Co.,Ltd. | All Rights Reserved