BETTER TOUCH BETTER BUSINESS
Contact Sales at TRANO.
TRCFA2-22E-T-H-1-3N | BEER KEG WASHING AND FILLING MACHINE | |||||||||
![]() | Matching Parameter | Two pumps. two tanks without insulating layer,hot water need connect with the other source | ||||||||
Tank Parameter | Two tanks,single tank 100L without insulating layer, one is caustic tank, the other one is acid tank. | |||||||||
Heater Way | Electrical heater incaustic tanks | Capacity | 15-20pcs/H(washer) 40-50pcs/H(Filler) | |||||||
Tank Insulating Layer | No | The table can rise or not | Yes | |||||||
Spear Type | A,S,D,M OR G ONE OF THEM | Filling Part With Flowmeter Or Not | No | |||||||
Power | 380V 3phase 50Hz 8KW | According To Customers Power Standard | ||||||||
Size(L*W*H) | 1.23*1.15*2.02M package: 1.35*1.23*2.25M | Package | Composite Borad Box | |||||||
Equipment explaination | 1. It is use the Siemens S7-200 controller and Schneider air break swtich,,Taiwan AirTAC solenoid valve,pump is Chinese Yuehua, if have flowmeter, we choose German Burkert. 2. Separate pipe systems of keg washing part and filling part. The cleaning process adds unique hot caustic washing and steam sterilization function. It can use the washing parts to do CIP to filling part. 3. Use couplers to connect with keg, keep pressure in a keg, no beer lost.The machine will stop until full. 4. The whole machine use the stainless steel AISI304. Pipeline welding uses German automatic pipe welding equipment, one-time welding double-sided forming. Washing working procedure: Pressing→air blowing/drain off→water washing→air blowing/drain off→low flow hot water washing spear→Rinse keg surface with hot water→ air blowing/drain off→low flow hot caustic washing spear→Rinse keg surface with caustic→air blowing/to caustic box→low flow hot water washing spear→Rinse keg surface with hot water washing→air blowing/drain off→low flow acid washing spear→Rinse keg surface with acid→air blowing/to acid box→low flow hot water washing spear→Rinse keg surface with hot water washing→air blowing/drain off→steam sterilized → steam keep pressure sterilized→ →co2 blowing/drain off→brew water rinse cooling keg →co2 blowing/drain off→co2 pressure preparing→cylinder return Filling working procedure: Pressing→open spear by hand→fill Co2→filling →close spear by hand | |||||||||
Copyright © 2025 Yantai Trano Co.,Ltd. | All Rights Reserved