loading


Beer Keg Washing And Filling Machine TRCFA3-33S-T-H-1-2M-L 1
Beer Keg Washing And Filling Machine TRCFA3-33S-T-H-1-2M-L 1

Beer Keg Washing And Filling Machine TRCFA3-33S-T-H-1-2M-L

5.0
Place of Origin:
Shandong, China
Model:
TRCFA3-33S-T-H-1-2M-L
Guarantee:
1 Year
Min.Order:
One set
Payment Terms:
T/T, L/C, Cash, Western Union
Delivery time:
40 working days
Packaging Details:
Plywood case with iron pallet
Supply Ability:
500 Sets per Month
Port:
Qingdao
Applicable Industries:
Food & Beverage Factory, Food Shop, Food & Beverage Shops
Automatic Grade:
Automatic, Semi-automatic
Voltage:
Customized
design customization

    oops...!

    no product data.

    Go to homepage
    TRCFA3-33S-T-H-1-2M-LBEER KEG WASHING AND FILLING MACHINE
    Beer Keg Washing And Filling Machine TRCFA3-33S-T-H-1-2M-L 2Matching ParameterThree pumps. three tank without insulating layer
    Tank ParameterThree tank,single tank 100L without insulating layer
    Heater WaySteam heater in two tanks( caustic and hot water)Capacity40-50pcs/H(washer)
    40-50pcs/H(Filler)
    Tank Insulating LayerNoThe table can rise or notYES
    Spear TypeA,S,D,M OR G ONE OF THEMFilling Part With Flowmeter Or NotYES
    Power380V 3phase 50Hz 3.0KWAccording To Customers Power Standard
    Size(L*W*H)

    2.25*2.20*2.10M                              

    package: 1.75*2.25*2.29M

    PackageComposite Borad Box
    Equipment explaination1. It is use the Siemens S7-200 controller and Schneider buttons and knobs.
    2. Separate pipe systems of keg washing part and filling part.The cleaning process adds unique hot caustic washing and steam sterilization function.  In addition,add acid washing function.
    3.  Fill way is invert.The machine will stop until full.
    4. You can clean all pipe with CIP system on filling part.
    5. The whole machine use the stainless steel AISI304. Pipeline welding uses German automatic pipe welding equipment, one-time welding double-sided forming.
    Washing working procedure:
    Pressing→air blowing/drain off→water washing→air blowing/drain off→hot caustic washing→air blowing/to caustic box→hot water1 washing→air blowing/drain off→hot water2 washing→steam blowing/drain off →co2 blowing/drain off→co2 pressure preparing→cylinder return  
    Filling working procedure:
    Pressing→steam sterilize keg spear→CO2/drain off →open the spear→co2 pressure preparing→filling→close the spear→hot water washing spear surface→steam/drain off→cylinder return
    GET IN TOUCH WITH Us
    just leave your email or phone number in the contact form so we can send you a free quote for our wide range of designs
    Related Products
    no data

    Contact Sales at TRANO.

    Professional aluminum can manufacturer

    Contact us

    Contact Person: Mrs.Wang
    E-mail: director@aluminum-can.com  
    Tel: 0086 13054501345
    Whats App: 0086 13054501345
    We Chat: 13054501345
    Address: No. 149 Nandajie Road,Zhifu Area Shandong China

    Copyright © 2026 TRANO | Sitemap Privacy Policy
    Customer service
    detect